Construction points of steel plate water stop belt
Release time:
2024-08-01
Location selection: We should try our best to ensure that the water sealing plate is on the middle line of the wall to ensure its waterproof effect. Welding quality: The welding between two steel plates should be full and double-sided welding, and the lap length is not less than 20mm to avoid leakage affecting the waterproof performance.

Location selection: We should try our best to ensure that the water sealing plate is on the middle line of the wall to ensure its waterproof effect.
Welding quality: The welding between two steel plates should be full and double-sided welding, and the lap length is not less than 20mm to avoid leakage affecting the waterproof performance.
Corner treatment: The treatment of the corner of the wall can be bent, T-shaped welding or 7-shaped welding, etc., to ensure the continuity and integrity of the water seal plate.
Support fixation: The support position of the steel plate is welded firmly to ensure that it will not shift or deform during the concrete pouring process.
Opening direction: The "opening" of the water seal plate should face the water surface to better block the penetration of external water flow.
Tags: